Login
Google Search
Calendar-Filter
|
@@ -Lines: 1-6 changed to +Lines: 1-7 @@
- House Paint:
+ !!__House Paint__
Ceiling = Dover White (supplied by Ryland)
Walls = 413-3 Ostrich Feather (supplied by Ryland)
- Power Room = Behr 720D-4 Ashwood
+ Power Room = Behr 720D-4 Ashwood (Satin)
Girls Bathroom = Behr 370A-2 Pale Daffodil (Satin) For painting behind the toilet, used 4 inch Smooth Services "Better" High density foam and newspaper to cover the back. @@ -Lines: 19-23 changed to +Lines: 20-27 @@
# Air should be pushing out water at station one.
# Wait and watch the other stations, make sure to keep the PSI below 50
+ # Remove the air hose.
+ # Reattach the piece on the right + # Set all valves to half way open.
# Drain the lines to the spickets: The one to the sprinkler needs to drain back into the house. The one to the back, if you give it a quick burst of water (after opening the drain) it will pull the water out the spicket.
Reverse process (minus the blowout) for spring. |